Site start
Building extension site start — macroom
macroom, Cork
1 commencement notice · start date 29 Jan 2016 · planning references given
Planning 15/04564&PL04.242327
- Commencement notices
- 1
- Latest start date
- 29 Jan 2016
- Latest notice
- Scale not stated
- Planning references
- 15/04564 · PL04.242327
- Location
- Inchinashingane, Macroom, Cork
Location
Where the site is
- Area
- macroom, Cork
- County
- Cork
Addresses on the notices
- Inchinashingane, Macroom, Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for PL04.242327. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Planning reference 15/04564 Increase height of the existing M1 Dryer Tower to Incorporate an additional floor and the construction of a link corridor between the existing M1 & M2 Drying Towers. Planning Reference Pl 04.242327 Construction of new mcc room at first floor level, new process area at second floor level and access stairs to serve both of the aforementioned
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.