Site start

Building extension site start — Inchicore

Inchicore, Dublin

1 commencement notice · start date 01 Jun 2015 · planning reference given

Planning 3807/14

Commencement notices
1
Latest start date
01 Jun 2015
Latest notice
Scale not stated
Planning reference
3807/14
Location
Inchicore, Dublin

Location

Where the site is

Area
Inchicore, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Amendments to proposal as previously granted under Ref. No. 2981/14 to include revision of the second floor layout, east & west (front) elevations with the changing of windows to dormers on the front elevation & an increase in the overall height from 8.50m to 8.95m above ground level.

Work stated for this notice Scale not stated for this notice.
Planning reference 3807/14

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.