Site start

Installation of two new single storey standalone prefabricated structure each containing

Oldleighlin, Carlow

1 commencement notice · start date 18 Sep 2024 · no planning reference given

Commencement notices
1
Latest start date
18 Sep 2024
Latest notice
280 m²
Planning references
None given
Location
Scoil Molaise, Oldleighlin, Carlow

Location

Where the site is

Area
Oldleighlin, Carlow
County
Carlow

Addresses on the notices

  • Scoil Molaise, Oldleighlin, Carlow
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Installation of two new single storey standalone prefabricated structure each containing 1no. Mainstream Classroom and sanitary facilities (Total floor area = 140.0sqm) to the front of existing school building at Scoil Molaise, old Leighlin, Co. Carlow

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 280 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.