Site start

Housing site start — Ballinteer

Ballinteer, Dublin

1 commencement notice · start date 29 May 2026 · planning reference given

Planning D25B/0247/WEB · Planning application

View full project timeline

Commencement notices
1
Latest start date
29 May 2026
Latest notice
1 house
Planning reference
D25B/0247/WEB
Location
Ballinteer, Dublin

Location

Where the site is

Area
Ballinteer, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

first floor extension of 32 sqm to the side of an existing two storey semidetached house, along with internal alterations to a ground floor wc, and the provision of a new window to an existing first floor bathroom and a new rooflight to the rear of the proposed roof at 497 Ballinteer Road, Dublin 16

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 168 m².

Planning reference D25B/0247/WEB

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.