Site start
Site start — Naas
Naas, Kildare
1 commencement notice · start date 21 Nov 2024 · planning reference given
Planning 24/216 · Council file · external
- Commencement notices
- 1
- Latest start date
- 21 Nov 2024
- Latest notice
- 255 m²
- Planning reference
- 24/216
- Location
- Naas, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 24/216 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Naas, Kildare
- County
- Kildare
Addresses on the notices
- ground floor level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 24/216. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(i) Construct an ESB substation on the South Western Corner of the Site, (ii) Construct a lean- to bin storage area in front of the Southern Side of the Existing Building. (iii) Carry out Internal alterations of the existing Staff Facilities Area at ground floor level. (iv) Construct a new Mezzanine Floor on the Southern End of the Existing Building. (v) Erect new Signage on the Southern (Front) Elevation of the Existing Building. (vi) Remove the existing 4No. Circular Tanks on the Northern Side of the Site and install a new rectangular Water Storage Tank. (vii) Construct a new Detached Workshop Shed on the Northern side of the existing building and all associated site works and services
Floor area stated for this source: 255 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.