Site start
Commercial site start — Waterford City
Waterford City, Waterford
1 commencement notice · start date 14 Jul 2015 · planning reference given
Planning 15/80 · Council file · external
- Commencement notices
- 1
- Latest start date
- 14 Jul 2015
- Latest notice
- 1 unit
- Planning reference
- 15/80
- Location
- Waterford City, Waterford
Location
Where the site is
- Area
- Waterford City, Waterford
- County
- Waterford
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
This development will consist of a new 26,484sq m manufacturing facility comprising a single building having a maximum parapet height of 13.2 m and a maximum overall height of 16.5 m above ground level, incorporating a two storey 8,315 sq m manufacturing and warehouse block with an intermediate mezzanine floor, a rooftop penthouse plantroom and open plant area, a two storey 8,357 sq m finishing and warehousing block with an intermediate mezzanine floor, a rooftop penthouse plantroom and open plant area, a three storey 2,349 sq m technical support and central utility block with a rooftop penthouse plantroom and open plant area having a maximum boiler stack height of 18.5 m above ground level, a three storey 7,242 sq m central administration and technical services block with a rooftop penthouse plantroom and open plant area, a single storey 24 sq m goods entrance security building, a single storey 16 sq m car park gate house, a single storey 66 sq m materials storage building, a single storey 54 sq m pump house, a 61 sq m electrical substation and two 12 m diameter and 5 m high water tanks and all associated site infrastructure.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.