Site start

Commercial site start — Waterford City

Waterford City, Waterford

1 commencement notice · start date 14 Jul 2015 · planning reference given

Planning 15/80 · Council file · external

Commencement notices
1
Latest start date
14 Jul 2015
Latest notice
1 unit
Planning reference
15/80
Location
Waterford City, Waterford

Location

Where the site is

Area
Waterford City, Waterford
County
Waterford
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

This development will consist of a new 26,484sq m manufacturing facility comprising a single building having a maximum parapet height of 13.2 m and a maximum overall height of 16.5 m above ground level, incorporating a two storey 8,315 sq m manufacturing and warehouse block with an intermediate mezzanine floor, a rooftop penthouse plantroom and open plant area, a two storey 8,357 sq m finishing and warehousing block with an intermediate mezzanine floor, a rooftop penthouse plantroom and open plant area, a three storey 2,349 sq m technical support and central utility block with a rooftop penthouse plantroom and open plant area having a maximum boiler stack height of 18.5 m above ground level, a three storey 7,242 sq m central administration and technical services block with a rooftop penthouse plantroom and open plant area, a single storey 24 sq m goods entrance security building, a single storey 16 sq m car park gate house, a single storey 66 sq m materials storage building, a single storey 54 sq m pump house, a 61 sq m electrical substation and two 12 m diameter and 5 m high water tanks and all associated site infrastructure.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference 15/80

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.