1 commencement notice · start date 30 Jul 2015 · planning reference given

Planning 15/425 · Council file · external

Commencement notices
1
Latest start date
30 Jul 2015
Latest notice
Scale not stated
Planning reference
15/425
Location
Oranmore, Galway

Location

Where the site is

Area
Oranmore, Galway
County
Galway

Addresses on the notices

  • first floor with a total area of 666m² (Phase 2 of proposed works) 6
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

1. Proposed external works these will include the erection of a new water storage and associated pump house to the south-west corner of the site and external plant equipment with fence enclosures to perimeter of the building. 2. Proposed Intake extension, a double height extension with dock door to the east elevation, with a proposed area of 180m² 3. Proposed dock door, a new dock door is proposed to be erected to the east elevation with an area of 10m² 4. Proposed compressor room, a two storey extension to the existing front (north) elevation with an area of 192m² 5. Proposed Services and Storage areas; a two storey extension to the existing front (north) elevation with services area on ground floor and storage area at first floor with a total area of 666m² (Phase 2 of proposed works) 6. Proposed Warehouse extension; a double height extension with 2no. dock doors to the west elevation with a new vehicular access ramp and a proposed area of 174m² 7. Proposed Elevation alterations; blocking up existing dock doors on east elevation and providing new pedestrian doors and steps (Phase 3 of proposed works) 8. Proposed Alterations to include partially enclosed external staircase to east elevation. The stairs will give access to internal first floor services void and second floor plant area. 9. Proposed Flag poles to front of building and signage to front (north) and side (west) elevations

Work stated for this notice Scale not stated for this notice.
Planning reference 15/425

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.