Commencement notice group
Building extension commencement notices — Collinstown Industrial Park
Collinstown Industrial Park, Kildare
1 unique commencement event · latest notified commencement 17 Sep 2024 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 17 Sep 2024
- Latest notice
- 817 m²
- Planning references supplied
- None stated
- Public location
- Collinstown Industrial Park, Kildare
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Collinstown Industrial Park, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
• Extension of the existing track system via LK1 Building into F10 North Support F-1 Occupancy and termination within the F10 Cleanroom H-5 Occupancy. Includes a 3-hr wall AMHS track fire door system to be installed in 2 no. locations. • Formation of new Cleanlink and Pedestrian Corridors within the F10 North Support with revised egress modifications. • New Fab and North Support Corridors MIMO cross connect Lobbies with both Man Door and Interstitial level maintenance doors access. • New staircase access to the Interstitial ceiling space (occupied for maintenance only) serving the AMHS track system. • Modified Fire Protection Sprinkler system. • Modified Fire Alarm system. • General compliance with the IBC, regarding the overall Fire Code Strategy of the design. • Modifications to the existing 3-hr plasterboard fire separation walling and supporting steelwork structure to the LK1-F10 interface for the AMHS crossing. • Modifications to the existing 8 inch (200mm) thick in-situ concrete walling 3-hr fire separation walling to the F10 North Support and F10 Fab interface for the AMHS crossing (noting 2 no. separate buildings here). • New Mech ventilation installation to serve the Cleanroom AMHS-Pedestrian Corridor track routing with 1 CFM ventilation and exhaust to meet Intel Cleanroom protocol requirements. • Additional Support rooms and spatial modifications to the North Support Fab level areas. Existing temporary building retrofitted for a Dry Waste Compound to the north side of /AWN structures. • 1 no. new MAH unit mounted at grade level to the underside of the LK1 Building (external undercroft).
Floor area stated for this source: 817 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.