Site start

Commercial site start — Blanchardstown

Blanchardstown, Dublin

2 commencement notices · latest start date 26 Jan 2026 · planning reference given

Planning FW25A/0103E · Planning application

View full project timeline

Commencement notices
2
Latest start date
26 Jan 2026
Latest notice
5,084 m²
Planning reference
FW25A/0103E
Location
Unit 200 Northwest Business Park, Blanchardstown, Dublin

Reviewed planning, commencement and document evidence

View the dossier catalogue

Exact reviewed project dossier for FW25A/0103E under Fingal County Council, retaining 2 separate commencement identities.

Commencement identities
2
retained separately
Latest group date
2026-01-26
not assigned across events
Maximum on one notice
Not stated
never summed
Reviewed index
6
1 exact document links

Planning and appeal references

Every retained commencement event

  • 2026-01-26 Commencement notice Official public source URL unavailable in the reviewed projection
  • 2026-01-26 Commencement notice 993 m² on this event

Exact organisation roles

  • Fingal County CouncilPlanningauthority · Authority retained with the exact reviewed planning identity.

Explicit facts with official citations

Each statement keeps its exact reference, official title or drawing-title locator, and review state.

  • Commencementevent Official commencement notice dated 2026-01-26 is retained as a separate event. Building Control commencement notice · Exact notice reference · reviewedsupported
  • Floorarea Notice states 993 m2 for that event; it is not treated as project total. Building Control commencement notice · Exact notice reference · reviewedsupported
  • Architecture The exact official file index lists "Contextual Street Elevations". FW25A/0103E · Contextual Street Elevations · Contextual Street Elevations · reviewedexacttitle Open official evidence
  • Architecture The exact official file index lists "Building 1 (Existing Warehouse And Logistics) - Elevations". FW25A/0103E · Building 1 (Existing Warehouse And Logistics) - Elevations · Building 1 (Existing Warehouse And Logistics) - Elevations · reviewedexacttitle Open official evidence
  • Otherdrawing The exact official file index lists "Landscape Masterplan West". FW25A/0103E · Landscape Masterplan West · Landscape Masterplan West · reviewedexacttitle Open official evidence
  • Otherdrawing The exact official file index lists "Landscape Masterplan East". FW25A/0103E · Landscape Masterplan East · Landscape Masterplan East · reviewedexacttitle Open official evidence
  • Engineeringanddrainage The exact official file index lists "Green Infrastructure Plan". FW25A/0103E · Green Infrastructure Plan · Green Infrastructure Plan · reviewedexacttitle Open official evidence
  • Engineeringanddrainage The exact official file index lists "Traffic & Transport Assessment (+ Mobility Management Plan)". FW25A/0103E · Traffic & Transport Assessment (+ Mobility Management Plan) · Traffic & Transport Assessment (+ Mobility Management Plan) · reviewedexacttitle Open official evidence

Official document index highlights

Reviewed exact official destinations and explicit index titles; this is not asserted to be the complete authority file.

Location

Where the site is

Area
Blanchardstown, Dublin
County
Dublin

Addresses on the notices

  • Unit 200 Northwest Business Park, Blanchardstown, Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Fingal County Council planning record Application details, status and decision record for FW25A/0103E. Fingal County Council Official link · last checked 29 Jul 2026 Reviewed exact authority-local planning record for this full planning reference.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Change of use of the facility from warehouse/ logistics use to transport depot including the use of existing buildings; other internal alterations and refurbishments to the existing buildings including ancillary office spaces. - Building 1

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 5,084 m².

Planning reference FW25A/0103E
Notice 2 Commencement notice

Change of use of the facility from warehouse/ logistics use to transport depot including the use of existing buildings; other internal alterations and refurbishments to the existing buildings including ancillary office spaces. - Building 2

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 993 m².

Planning reference FW25A/0103E

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.