Commencement notice group
Housing commencement notices — Tullow
Tullow, Carlow
2 unique commencement events · latest notified commencement 24 Mar 2021 · planning basis not stated
- Unique commencement events
- 2
- Latest notified commencement
- 24 Mar 2021
- Latest notice
- 466 m²
- Planning references supplied
- None stated
- Public location
- Tullow, Carlow
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Tullow, Carlow
- County
- Carlow
Notice location variants
- Phelim Wood, Carlow CN0058911CW
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Part demolish existing single storey industrial unit and relocate existing entrance to construct 4 number semi detached, two storey dwellings, 4 number entrances, connection to existing services, boundary fencing and landscaping ,extension of existing footpath and access from existing internal road way within Station Manor (PL 04 - 406) and all associated site works
Floor area stated for this source: 466 m².
Source unit value with scope not stated: 4 houses. It is not presented as notice-specific scale.
The demolition of single storey industrial unit and the relocation of existing entrance to construct 4 no. semi detached, two storey dwellings, 4 no. entrances, connection to existing services, boundary fencing, extension of existing footpath and access from existing internal roadway within Station Manor and all associated site works.
Floor area stated for this source: 466 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.