Site start
Housing site start — Clontarf
Clontarf, Dublin
1 commencement notice · start date 27 Jan 2020 · planning reference given
Planning 3457/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 27 Jan 2020
- Latest notice
- 1 house
- Planning reference
- 3457/19
- Location
- Clontarf, Dublin
Location
Where the site is
- Area
- Clontarf, Dublin
- County
- Dublin
Addresses on the notices
- ground floor level, with new pitched roof canopy over front extension and existing entrance
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of alterations to existing two storey four bedroom semi-detached dwelling including: (i) the construction of a single storey flat roof extension to rear and single storey extension to front, both at ground floor level, with new pitched roof canopy over front extension and existing entrance; (ii) construction of an extension to side at first floor level with extension of existing pitched roof form; (iii) flat roof extension to rear bedroom at first floor level; (iv) attic conversion to include a dormer window to rear; (v) construction of a single storey shed & gym to rear of site with proposed pedestrian and bicycle access off laneway at rear of site Other works as part of the development include: rooflights; alterations to existing elevations; landscaping; and all associated works to facilitate the development.
Floor area stated for this source: 303 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.