Commencement notice group

the Armada Hotel — commencement notices

Spanish Point, Clare

1 separate notice · latest notified commencement 03 Dec 2024 · planning reference supplied

Source notices
1
Latest notified commencement
03 Dec 2024
Latest notice
17 m²
Planning references supplied
P20/84
Public location
Spanish Point, Clare

Public source geography

Site location

Public site / locality
Spanish Point, Clare
County
Clare

Public site labels seen across the notices

  • the Armada Hotel, Spanish Point, Co
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning referenceP20/84

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0123980CE BCMS owner-supplied export

To construct / install a cabin to be used as short term tourist accommodation ancillary to the existing Armada Hotel Complex, and to install a waste water storage tank, along with associated site works at the Armada Hotel, Spanish Point, Co. Clare.

17 m² · stated on this notice

Planning reference P20/84 Builder stated: CDME Contracting Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.