Commencement notice group
Housing commencement notices — Tullamore
Tullamore, Offaly
1 unique commencement event · latest notified commencement 16 Mar 2020 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 16 Mar 2020
- Latest notice
- 26 houses
- Planning references supplied
- 18/330
- Public location
- Tullamore, Offaly
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 1
- Open exact official planning record: 18/330 Offaly County Council · checked 2026-07-29T15:49:20+00:00
Planning 18/330 — CONDITIONAL · Decision 2019-03-07 · Final grant 2019-04-12
- Completion certificate recorded — source scope not stated Offaly County Council · commencement CN0062940OY Certificate CC00000037312OY · First observed in the official monthly source 2020-03 26 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Tullamore, Offaly
- County
- Offaly
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Offaly County Council planning record Application details, status and decision record for 18/330. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A RESIDENTIAL DEVELOPMENT ON A 0.93HA SITE (2.3 ACRE) WHICH IS BOUNDED BY THE R443 SRAH ROAD TO THE NORTHEAST, THE L2007 RAHAN ROAD TO THE NORTHWEST SIDE, THE EXISTING RAILWAY LINE TO THE SOUTH WEST AND TO THE SOUTH EAST BY EXISTING RESIDENTIAL DEVELOPMENT. ACCESS TO THE SITE IS FROM THE SRAH ROAD THAT BOUNDS THE DEVELOPMENT TO THE NORTH EAST. THE DEVELOPMENT COMPRISES THE FOLLOWING - 26NO TWO STOREY HOUSES IN THE FOLLOWING MIX. 2 NO. THREE-BEDROOM SEMI-DETACHED TYPE A UNITS, 6 NO. THREE-BEDROOM END OF TERRACE TYPE A UNITS, 12 NO. THREE-BEDROOM MID-TERRACED TYPE A1 UNITS; 2NO TWO-BEDROOM END OF TERRACE TYPE B UNITS; 4NO TWO-BEDROOM MID-TERRACE TYPE B1 UNITS TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT / CAR PARKING / LANDSCAPING/ BOUNDARY DETAIL WORKS
Floor area stated for this source: 2,731 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.