Site start
Ground floor
Ballincollig, Cork
1 commencement notice · start date 03 Apr 2024 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 03 Apr 2024
- Latest notice
- 71 m²
- Planning references
- None given
- Location
- Ballincollig, Cork
Location
Where the site is
- Area
- Ballincollig, Cork
- County
- Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Ground floor: Changing a bedroom to a kitchen and Alterations to an existing space to provide for shower, WC, and bedroom suitable for persons with disability. First floor: alterations to first floor bathrooms to provide for ambulant disabled cubicles and urinals The overall number of bedspaces reduced from 98 beds to 80 beds within the complex.
Floor area stated for this source: 71 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.