Site start
Two-storey extension to the side of our home
Carbury, Kildare
1 commencement notice · start date 03 Sep 2024 · planning reference given
Planning 23/28 · Council file · external
- Commencement notices
- 1
- Latest start date
- 03 Sep 2024
- Latest notice
- Scale not stated
- Planning reference
- 23/28
- Location
- Carbury, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 23/28 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Carbury, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 23/28. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Two-storey extension to the side of our home consisting of the demolition of an existing single storey lean-to structure to the side and external shed to the rear and provision of 86sqm gross floor area at the ground floor providing entrance hall, living room, kitchen/dining room, utility room, bathroom and 48 sqm gross floor area at the first floor providing two bedrooms, reading space and bathroom, along with a new on-site waste water treatment system and ancillary site works at Lily's, Carbury, Co. Kildare, in accordance with the plans submitted with the application.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.