Site start

Housing site start — Inchicore

Inchicore, Dublin

2 commencement notices · latest start date 23 May 2018 · planning reference given

Planning 4029/16

Commencement notices
2
Latest start date
23 May 2018
Latest notice
75 m²
Planning reference
4029/16
Location
Inchicore, Dublin

Location

Where the site is

Area
Inchicore, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

7-Day Notice - Amendment to existing Fire cert FSC1849/18/7d for rear escape

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 75 m².

Planning reference 4029/16
Notice 2 Seven-day notice

Change of use of existing ground floor to cafe/retail use with new shop front, external seating to rear and remodelling of existing first floor two bed apartment with new access door to new enclosed private open space on existing roof with associated site works

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference 4029/16

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.