Site start

Housing site start — Bandon

Bandon, Cork

3 commencement notices · latest start date 14 Mar 2024 · planning reference given

Planning 20/6697 · Planning application

View full project timeline

Commencement notices
3
Latest start date
14 Mar 2024
Latest notice
12,655 m²
Planning reference
20/6697
Location
Bandon, Cork

Location

Where the site is

Area
Bandon, Cork
County
Cork

Addresses on the notices

  • Coolfadda, Bandon, Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Phase 2 Cúl na Gréine, Coolfadda, Bandon: The construction of 22 no. residential dwellings, Nos 18-22, 55-60 & 67-77 Cúl na Gréine. Which consists of 6no. semi detached two- storey dwellings, 15 no. terraced dwellings and 1no. detached dwellings, and all associated site development works at Coolfadda, Bandon, Cork.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 12,655 m².

Source unit value with scope not stated: 22 houses. It is not presented as notice-specific scale.

Planning reference 20/6697 Developer stated: Sunfield Bandon Ltd
Notice 2 Commencement notice (owner-supplied)

Phase 4 Cúl na Gréine, Coolfadda, Bandon: The construction of 20 no. residential dwellings, Nos 31-47 & 61-63 Cúl na Gréine. Which consists of 6no. semi detached two- storey dwellings, 11 no. terraced dwellings and 3no. detached dwellings, and all associated site development works at Coolfadda, Bandon, Cork.

Work stated for this notice 20 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 9,208 m².

Planning reference 20/6697 Developer stated: Sunfield Bandon Ltd
Notice 3 Commencement notice

Phase 3 Cúl na Gréine, Coolfadda, Bandon: The construction of 18 no. residential dwellings, Nos 23-30, 48-54 & 64-66 Cúl na Gréine. Which consists of 8no. semi detached two-storey dwellings, 7no. terraced dwellings and 3no. detached dwellings, and all associated site development works at Coolfadda, Bandon, Cork.

Work stated for this notice 18 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 8,807 m².

Planning reference 20/6697

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.