Commencement notice group

Benson Court — commencement notices

Sligo, Sligo

9 unique commencement events · latest notified commencement 18 Feb 2025 · planning basis not stated

Unique commencement events
9
Latest notified commencement
18 Feb 2025
Latest notice
4 units
Planning references supplied
None stated
Public location
Sligo, Sligo

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Sligo, Sligo
County
Sligo

Notice location variants

  • Ballymote, Sligo
  • Benson Court, Cranmore, Sligo
  • Geldof Drive, Cranmore, Sligo
Location evidence needs care
  • Notice source points are up to 19.7 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 54.093134, -8.532479 Open point
  • Public notice source · 54.093134, -8.532479 Open point
  • Public notice source · 54.093134, -8.532479 Open point
  • Public notice source · 54.093134, -8.532479 Open point
  • Public notice source · 54.093134, -8.532479 Open point
  • Public notice source · 54.093134, -8.532479 Open point
  • Public notice source · 54.093134, -8.532479 Open point
  • Public notice source · 54.264537, -8.463189 Open point
  • Public notice source · 54.266020, -8.466010 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

Duplex Apartment Housing Unit Block 15, Cuil Rois Phase 2, Camross, Ballymote to include siteworks and infrastructure

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 306 m².

Notice 2 Commencement notice

Duplex Apartment Housing Unit Block 14, Cuil Rois Phase 2, Camross, Ballymote to include siteworks and infrastructure

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 296 m².

Notice 3 Commencement notice

Duplex Apartment Housing Unit Block 13, Cuil Rois Phase 2, Camross, Ballymote to include siteworks and infrastructure

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 296 m².

Notice 4 Commencement notice

Duplex Apartment Housing Unit Block 12, Cuil Rois Phase 2, Camross, Ballymote to include siteworks and infrastructure

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 296 m².

Notice 5 Commencement notice

Duplex Apartment Housing Unit Block 3, Cuil Rois Phase 2, Camross, Ballymote to include siteworks and infrastructure

Work stated for this notice 2 units Explicit phase quantity stated by the source.

Floor area stated for this source: 121 m².

Notice 6 Commencement notice

Duplex Apartment Housing Unit Block 2, Cuil Rois Phase 2, Camross, Ballymote to include siteworks and infrastructure

Work stated for this notice 2 units Explicit phase quantity stated by the source.

Floor area stated for this source: 121 m².

Notice 7 Commencement notice

Duplex Apartment Housing Unit Block 1, Cuil Rois Phase 2, Camross, Ballymote to include siteworks and infrastructure

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 270 m².

Notice 8 Commencement notice

Construction of a two-storey residential block, Block C & D, at Benson Court, Cranmore, Sligo.

Work stated for this notice 16 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,211 m².

Notice 9 Commencement notice (owner-supplied)

Construction of a two-storey residential block, Block A & B, at Geldof Drive, Cranmore, Sligo.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,082 m².

Source unit value with scope not stated: 14 units. It is not presented as notice-specific scale.

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.