Housing site start — Adare
Adare, Limerick
1 commencement notice · start date 14 Mar 2022 · planning reference given
Planning 21/341 · Council file · external
- Commencement notices
- 1
- Latest start date
- 14 Mar 2022
- Latest notice
- Scale not stated
- Planning reference
- 21/341
- Location
- Adare, Limerick
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 21/341 Limerick City and County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Adare, Limerick
- County
- Limerick
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Limerick City and County Council planning record Application details, status and decision record for 21/341. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
part two-storey, part single-storey extension, to the rear of an existing terraced two-storey house, replacement of PVC windows on front elevation with traditional timber sash windows and replacement of front door and garage doors on front elevation. Works to include; the demolition of; existing two-storey and single-storey rear extensions and the single-storey shed to the rear and alterations to the internal layout and rear of the existing house and all associated site works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.