Site start

Housing site start — Dublin

Dublin 17, Dublin

1 commencement notice · start date 17 Sep 2024 · planning references given

Planning ABP-312060-21 /F21A/0401

Commencement notices
1
Latest start date
17 Sep 2024
Latest notice
20 units
Planning references
F21A/0401 · ABP-312060-21
Location
Dublin 17, Dublin

Location

Where the site is

Area
Dublin 17, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-312060-21. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

The construction of a 3-storey building with 20 residential units (8 Apartments, 10 ‘own door’ Duplex units and 2 ‘own door’ Triplex units).

Work stated for this notice 20 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,972 m².

Planning reference F21A/0401 Appeal reference ABP-312060-21

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.