Commencement notice group

Commencement notices — Killoe

Killoe, Longford

1 separate notice · latest notified commencement 28 Sep 2020 · planning reference supplied

Source notices
1
Latest notified commencement
28 Sep 2020
Latest notice
1 m²
Planning references supplied
2017
Public location
Killoe, Longford

Public source geography

Site location

Public site / locality
Killoe, Longford
County
Longford
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Longford County Council · reference 2017 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference2017

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0068492LD BCMS open-data feed

the continuance of (i) extraction of aggregates on an area of 1.431 hectares; (ii) processing/loading of aggregates on an area of 0.233 hectares; (iii) manufacture of ready-mix concrete in existing plant (176m2); (iv) importation and storage of sand for use in concrete manufacturing (0.008 hectares); (v) use of existing weighbridge and wheel wash (154m2)and (vi) existing site entrance and access areas (0.956 hectares), all within 2.661 hectares of the site development authorised under Pl08/529 and all ancillary works

1 m² · stated on this notice

Planning reference 2017

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.