Commencement notice group

The school — commencement notices

Monasterevin, Kildare

1 unique commencement event · latest notified commencement 26 Oct 2020 · planning reference supplied

Unique commencement events
1
Latest notified commencement
26 Oct 2020
Latest notice
9,230 m²
Planning references supplied
16/1140
Public location
Monasterevin, Kildare

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Monasterevin, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0069662KE BCMS open-data feed

The development will consist of the construction of a post primary school ( Saint Paul’s Secondary School ), which will accommodate c.850 pupils, comprising 31 no. general classrooms, 18 no. specialist classrooms, special educational needs unit, library, general purpose / dining / social areas, staff / administration areas, multi-use hall and fitness area, store areas, toilets, and all ancillary areas. The building will have a maximum building height of 12.13m. The school building is two storeys high with glass roof lanterns above the ridge line and includes an external store. Vehicular access will be off the R417 (Athy Road), with new access gates, in a new opening in the existing demesne wall. The development will include the provision of 1 no. grassed playing pitch, 4 no. hard surface play areas, 94 no. car parking spaces (to include car set down), cycle parking areas, bus set down areas, all ancillary site development, landscaping and boundary treatment, drainage and infrastructural works, including new surface water drainage from the school to the river Barrow and new electrical substation with access off the R417.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 9,230 m².

Planning reference 16/1140

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.