Site start
Building extension site start — Malahide
Malahide, Dublin
1 commencement notice · start date 25 Feb 2025 · planning reference given
Planning F24A/0423E · Planning application
- Commencement notices
- 1
- Latest start date
- 25 Feb 2025
- Latest notice
- Scale not stated
- Planning reference
- F24A/0423E
- Location
- Malahide, Dublin
Location
Where the site is
- Area
- Malahide, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the construction of a new single storey flat roofed side extension. New first floor extension above existing ground floor and associated extension of existing pitched roof. Internal layout changes to ground and first floor and modifications to existing window openings. New rendered external wall insulation. New rooflight to existing pitched roof. Modifications to existing front door and associated new canopy. Demolition of existing garage. Demolition of existing chimneys. New access gates to side boundary on Sonesta. All associated landscaping and boundary treatment works, drainage, ancillary site works and services.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.