Site start

Housing site start — Greystones

Greystones, Wicklow

2 commencement notices · latest start date 17 Oct 2022 · planning references given

Planning 22116 · Planning application · Council file · external

View full project timeline

Commencement notices
2
Latest start date
17 Oct 2022
Latest notice
Scale not stated
Planning references
221/16 · 22116
Location
Greystones, Wicklow

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Greystones, Wicklow
County
Wicklow

Addresses on the notices

  • Bray, Wicklow
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Wicklow County Council planning record Application details, status and decision record for 221/16. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The construction of new single storey extensions (totaling circa 50.33m2) to front and rear of an existing 111.40m2 two storey dwelling

Work stated for this notice Scale not stated for this notice.
Planning reference 22116
Notice 2 Commencement notice

OPT OUT. Construction of a single storey extension with attic room to the rear and side of existing dwelling; internal alterations; demolition of shed. Planning application ref no 15/1140

Work stated for this notice 1 house Explicit phase quantity stated by the source.
Planning reference 221/16

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.