Site start
Building extension site start — Dublin
Dublin
1 commencement notice · start date 24 Jul 2017 · planning reference given
Planning 3586/16
- Commencement notices
- 1
- Latest start date
- 24 Jul 2017
- Latest notice
- Scale not stated
- Planning reference
- 3586/16
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The removal of existing signage, relocation and reduction of numbers of flagpoles, new awnings over windows and doors new external doors to replace existing doors at ground floor, new door and window surrounds, new signage to reflect new branding of the premises, removal of existing light fittings and replacement with architectural fittings and the installation of an Automatic Teller Machine (ATM).
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.