Housing site start — Ashbourne

Ashbourne, Meath

3 commencement notices · latest start date 14 Oct 2026 · planning references given

Planning 23/873 · Council file · external

View full project timeline

Commencement notices
3
Latest start date
14 Oct 2026
Latest notice
70 units
Planning references
23/873 · 23873
Location
Ashbourne, Meath

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning 23/873 — CONDITIONAL · Decision 2023-11-01 · Final grant 2024-08-29

Exact appeal 318496 · Appeal declared withdrawn S.140(2)(b) · 2024-08-23 · Open official case

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Ashbourne, Meath
County
Meath

Addresses on the notices

  • site at south of Baltrasna Manor, Western side of the Dublin Road (R135), Ashbourne, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Meath County Council planning record Application details, status and decision record for 23/873. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of 70 No. dwellings comprised of 40 no. 2, 3 and 4 bedroom house units, and 30 no. 1, 2, and 3 bedroom apartment units in 2 blocks, with associated public open space, roads and site works.

Work stated for this notice 70 units Explicit phase quantity stated by the source.
Planning reference 23/873 Developer stated: Apolloseven Investments Limited
Notice 2 Commencement notice (owner-supplied)

Construction of 40 no. dwellings. Location Dublin Road, Ashbourne, Co. Meath

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 5,042 m².

Source unit value with scope not stated: 40 houses. It is not presented as notice-specific scale.

Planning reference 23873 Developer stated: Apolloseven Investments Ltd
Notice 3 Seven-day notice

The development consists of 30 apartments in two blocks connected via a bicycle store and includes associated bin store at site at south of Baltrasna Manor, Western side of the Dublin Road (R135), Ashbourne, Co. Meath

Work stated for this notice 30 units Explicit phase quantity stated by the source.

Floor area stated for this source: 3,388 m².

Planning reference 23873

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.