Site start
Site start — Dublin
Dublin
1 commencement notice · start date 20 Nov 2026 · planning reference given
Planning F22A/0460 · Planning application
- Commencement notices
- 1
- Latest start date
- 20 Nov 2026
- Latest notice
- 625 m²
- Planning reference
- F22A/0460
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- the west ramp and 3
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The proposed development will consist of the construction of a subterranean Underpass of Runway 16/34, a critical airfield operational safety project, which will comprise: a) A twin-cell enclosed tunnel with 2 no. lanes in each direction, linked to the surface by ramps, portals, and light attenuation screen (1.8m in height above existing ground level at the west ramp and 3.3m in height above existing ground level at the east ramp). The enclosed section will be approximately 0.7 km long, with an overall alignment of approximately 1.1 km in length from top of ramp to top of ramp. It will be approximately 24m in external width, and approximately 5.5m in internal height from road to tunnel ceiling. It will be up to 17.5m below existing ground level; b) Plant room, of approximately 625m2, which will comprise housing for transformers, pumps, controls and communications equipment, located underground at the portal of the east ramp, a parking layby and utilities corridor crossing; c) Demolition (approximately 23,741m2) and reinstatement (approximately 16,216m2) of part of the pavement surfaces of Apron Taxiway 4, Taxiway F-2, Runway 16/34 (the crosswind runway), Taxiway W1 and W2, and the West Apron; d) Access roads to tie in with the existing airside road network at each end of the proposed Underpass (at Pier 3 on the Eastern Campus and the West Apron on the Western campus respectively), and 31no. car parking spaces at surface level at Pier 3; e) Demolition (approximately 97m2) of fixed links (elevated enclosed passenger walkways leading from the Pier to Aircraft Nodes) and Nodes (structures which provide support for the fixed links and internal pedestrian access cores to ground level) serving 3 no. aircraft stands and associated airbridges (passenger boarding bridges) at Level 20 (departure gates) of Pier 3. To the south of Pier 3, an existing airbridge is to be removed and an existing fixed link is to be adjusted to service existing stands in that area; f) Replacement of
Floor area stated for this source: 625 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.