Site start
Commercial site start — Newbridge
Newbridge, Kildare
3 commencement notices · latest start date 18 Jul 2025 · planning reference given
Planning 211145 · Planning application · Council file · external
- Commencement notices
- 3
- Latest start date
- 18 Jul 2025
- Latest notice
- 245 m²
- Planning reference
- 211145
- Location
- Unit 6 Athgarvan Road, Newbridge, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 3
- Open exact official planning record: 211145 Kildare County Council
- Partial completion certificate recorded Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-06 1 units stated for this certificate · One certificate representation
- Partial completion certificate recorded Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-06 1 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2025-07 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Newbridge, Kildare
- County
- Kildare
Addresses on the notices
- Unit 6 Athgarvan Road, Newbridge, Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 211145. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase 1 Enabling Works–(for change of use from existing light industrial and retail warehousing to Retail Class 1 use comprising of Shell & Core Fire Safety Works to Unit 6
Floor area stated for this source: 245 m².
Phase 1 Enabling works – (for change of use from existing light industrial/manufacturing and retail warehousing use to Retail Class 1 use comprising of (a) refurbishment of unit 3 internal layouts including the provision of ancillary ground floor accommodation with toilets, offices, staff facilities, kitchen and stores (b) Alterations to car park and landscaping (c) External infrastructure upgrade works for utility and service connections to the building (d) forming new entrances and shopfronts to Unit 3)
Floor area stated for this source: 979 m².
Phase 1 Enabling works – (for change of use from existing light industrial/manufacturing and retail warehousing use to Retail Class 1 use comprising of (a) refurbishment of unit 5 internal layouts including the provision of ancillary ground floor accommodation with toilets, offices, staff facilities, kitchen and stores (b) Alterations to car park and landscaping (c) External infrastructure upgrade works for utility and service connections to the building (d) forming new entrances and shopfronts to Unit 5)
Floor area stated for this source: 510 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.