Site start

Commercial site start — Newbridge

Newbridge, Kildare

3 commencement notices · latest start date 18 Jul 2025 · planning reference given

Planning 211145 · Planning application · Council file · external

View full project timeline

Commencement notices
3
Latest start date
18 Jul 2025
Latest notice
245 m²
Planning reference
211145
Location
Unit 6 Athgarvan Road, Newbridge, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
3
  1. Partial completion certificate recorded Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-06 1 units stated for this certificate · One certificate representation
  2. Partial completion certificate recorded Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-06 1 units stated for this certificate · One certificate representation
  3. Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2025-07 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Newbridge, Kildare
County
Kildare

Addresses on the notices

  • Unit 6 Athgarvan Road, Newbridge, Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 211145. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Phase 1 Enabling Works–(for change of use from existing light industrial and retail warehousing to Retail Class 1 use comprising of Shell & Core Fire Safety Works to Unit 6

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 245 m².

Planning reference 211145
Notice 2 Seven-day notice

Phase 1 Enabling works – (for change of use from existing light industrial/manufacturing and retail warehousing use to Retail Class 1 use comprising of (a) refurbishment of unit 3 internal layouts including the provision of ancillary ground floor accommodation with toilets, offices, staff facilities, kitchen and stores (b) Alterations to car park and landscaping (c) External infrastructure upgrade works for utility and service connections to the building (d) forming new entrances and shopfronts to Unit 3)

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 979 m².

Planning reference 211145
Notice 3 Seven-day notice

Phase 1 Enabling works – (for change of use from existing light industrial/manufacturing and retail warehousing use to Retail Class 1 use comprising of (a) refurbishment of unit 5 internal layouts including the provision of ancillary ground floor accommodation with toilets, offices, staff facilities, kitchen and stores (b) Alterations to car park and landscaping (c) External infrastructure upgrade works for utility and service connections to the building (d) forming new entrances and shopfronts to Unit 5)

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 510 m².

Planning reference 211145

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.