Site start

Building extension site start — Dublin

Dublin 18, Dublin

1 commencement notice · start date 22 Jun 2023 · planning reference given

Planning D23A/0044 · Planning application

View full project timeline

Commencement notices
1
Latest start date
22 Jun 2023
Latest notice
83 m²
Planning reference
D23A/0044
Location
Dublin 18, Dublin

Location

Where the site is

Area
Dublin 18, Dublin
County
Dublin

Addresses on the notices

  • rear
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Planning permission for demolition of the existing sunroom at rear. Construction of a double storey extension to the side and single storey extension at rear with rooflights and widening the existing vehicular access onto Castle Farm.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 83 m².

Planning reference D23A/0044

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.