Site start
Building extension site start — Glasnevin
Glasnevin, Dublin
1 commencement notice · start date 10 Apr 2018 · planning reference given
Planning 4078/17
- Commencement notices
- 1
- Latest start date
- 10 Apr 2018
- Latest notice
- Scale not stated
- Planning reference
- 4078/17
- Location
- Glasnevin, Dublin
Location
Where the site is
- Area
- Glasnevin, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development comprises: (i) first floor extension with hipped roof, with 1 no. window to front south elevation; together with lean-to roof above converted ground floor garage extension with 1 no. new window on front south elevation; (ii) proposed ground floor flat roof rear extension with 1 no roof light and replacement of lean- to roof on east elevation with flat roof and 1 no. rooflight; (iii) refurbishment of existing rear north facing balcony with new rendered finish and glazed elements; with all associated site and ground works necessary to facilitate the development.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.