Commencement notices — Ringsend
Ringsend, Dublin
1 unique commencement event · latest notified commencement 08 Feb 2019 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 08 Feb 2019
- Latest notice
- 191 m²
- Planning references supplied
- None stated
- Public location
- Ringsend, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Ringsend, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The development will consist of the construction of a new single storey operational control room, complete with electrical switch room to ESB specifications. A transformer will be sited adjacent to the North side of the new control room. The new control room is to be located adjacent to the existing terminal entrance/ exit gate onto Shelly Banks Road. The construction of a new pump-pad, truck loading gantry complete with a weather proof enclosure, above ground interceptor, horizontal marker dye tank with associated bund, impervious upgrade of existing bund areas and tank refurbishment. The installation of new pipe-work, pumps, fire protection system including firewater tank and other associated works. These development works will result in the site being upgraded to UPPER TIER under the SEVESO regulations.
Floor area stated for this source: 191 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.