Commencement notice group
Housing commencement notices — Ballina
Ballina, Mayo
1 separate notice · latest notified commencement 16 Feb 2022 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 16 Feb 2022
- Latest notice
- 4 units
- Planning references supplied
- 21/243
- Public location
- Ballina, Mayo
Public source geography
Site location
- Public site / locality
- Ballina, Mayo
- County
- Mayo
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Mayo County Council · reference 21/243 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Change the layout of the residential 3rd floor plan of existing building that was previously granted permission under P00/2085 from a single 2 bedroomed apartment to 1 no studio apartment and 1no 2 bedroom apartment, change relates to part of the ground floor derelict retail area with a floor area of 123.97 changing to 2no studio apartments
4 units · 241 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.