Site start
Housing site start — Dublin
Dublin 18, Dublin
5 commencement notices · latest start date 26 Apr 2021 · planning references given
Planning ABP30258018 · Planning application
- Commencement notices
- 5
- Latest start date
- 26 Apr 2021
- Latest notice
- 800 m²
- Planning references
- ABP30258018 · ABP-302580-18
- Location
- Dublin 18, Dublin
Location
Where the site is
- Area
- Dublin 18, Dublin
- County
- Dublin
Addresses on the notices
- Dublin
- Glencairn House, Murphystown Way, Leopardstown, Dublin 18
- site at Glencairn, Murphystown Way, Leopardstown, Dublin 18
- Notice source points are up to 11.0 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.266068, -6.206383 Open point
- Public notice source · 53.266160, -6.208460 Open point
- Public notice source · 53.296985, -6.363993 Open point
- Public notice source · 53.267344, -6.208181 Open point
- Public notice source · 53.266536, -6.210014 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP30258018. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of new residence and gatehouse at Glencairn House, Murphystown Way, Leopardstown, Dublin 18
Floor area stated for this source: 800 m².
Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.
Infrastructure works & boundary securitty wall associated with Glencairn House, Murphystown Way, Leopardstown, Dublin 18
Floor area stated for this source: 51,500 m².
Infrastructure works (public roads upgrade) associated with proposed 341 no. residential units at site at Glencairn, Murphystown Way, Leopardstown, Dublin 18
Floor area stated for this source: 51,500 m².
Construction of a new residential complex development located on Murphystown Way, Dublin 18. The development will consist of 160 residential units (ranging from 1 to 3 bed apartments) located within five blocks, (Block 2 to 6) ranging from a height of 4-5 storeys above a shared basement.
Floor area stated for this source: 12,834 m².
Source unit value with scope not stated: 160 units. It is not presented as notice-specific scale.
Enabling works to site, including infrastructure works (roads, drainage, site clearance) & erection of hoarding associated with proposed 341 no. residential units at site at Glencairn, Murphystown Way, Leopardstown, Dublin 18
Floor area stated for this source: 51,500 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.