Site start
This Commencement Notice relates to Zone 13, 14 & 15
Dublin
1 commencement notice · start date 26 Apr 2024 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 26 Apr 2024
- Latest notice
- 42 houses
- Planning references
- None given
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
This Commencement Notice relates to Zone 13, 14 & 15 within Phase 1B of the overall Multi-Phase Residential Development on Oscar Traynor Road. There are 42 residential units (All dwellings) in these zones out of a total of 200 Residential Units in Phase 1B and 853 Residential Units across all phases within the development. There are 2 no. semi-detached units (BS04) and 40 no. terraced dwellings. These dwellings range from 2 storeys to 3 storeys and consist of 2-bed & 3-bed units. The end terraced dwellings in some units have a different no. of bedrooms compared to the mid-terraced dwellings. Therefore, they have been separated into distinct buildings for the purpose of this Commencement Notice.
Floor area stated for this source: 4,002 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.