Commencement notice group

Housing commencement notices — Portmarnock

Portmarnock, Dublin

2 separate notices · latest notified commencement 17 Aug 2018 · planning reference supplied

Source notices
2
Latest notified commencement
17 Aug 2018
Latest notice
17 homes
Planning references supplied
F14A/0132
Public location
Portmarnock, Dublin

Public source geography

Site location

Public site / locality
Portmarnock, Dublin
County
Dublin

Public site labels seen across the notices

  • Drumnigh Manor, Drumnigh Road, Portmarnock, Co
  • Drumnigh Manor, Drumnigh Road, Portmarnock, Co Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning referenceF14A/0132

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0042828FL BCMS open-data feed

Construction of 17 No. Houses at Drumnigh Manor, Drumnigh Road, Portmarnock, Co. Dublin

17 homes · 2,387 m² · stated on this notice

Planning reference F14A/0132
CN0041515FL BCMS open-data feed

Construction of 43 No. Houses at Drumnigh Manor, Drumnigh Road, Portmarnock, Co Dublin

43 homes · 7,050 m² · stated on this notice

Planning reference F14A/0132

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.