Site start
Housing site start — Glasnevin
Glasnevin, Dublin
1 commencement notice · start date 14 Aug 2017 · planning reference given
Planning 2310/17
- Commencement notices
- 1
- Latest start date
- 14 Aug 2017
- Latest notice
- Scale not stated
- Planning reference
- 2310/17
- Location
- Glasnevin, Dublin
Location
Where the site is
- Area
- Glasnevin, Dublin
- County
- Dublin
Addresses on the notices
- GROUND FLOOR LEVEL
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
EXTENSIONS TO SIDE AND REAR OF EXISTING HOUSE CONSISTING OF FAMILY ROOM EXTENSION TO REAR OF EXISTING EXTENSION AND MODIFICATIONS TO EXISTING UTILITY ROOM ALL AT GROUND FLOOR LEVEL; BEDROOM EXTENSION WITH EN-SUITE BATHROOM TO REAR AND SIDE EXTENSION TO MAIN BATHROOM ALL AT FIRST FLOOR LEVEL, TOGETHER WITH ROOFLIGHTS TO LANDING, BATHROOMS AND UTILITY ROOM
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.