Commencement notice group

Housing commencement notices — Cherrywood

Cherrywood, Dublin 18, Dublin

6 separate notices · latest notified commencement 27 Sep 2024 · planning reference supplied

Source notices
6
Latest notified commencement
27 Sep 2024
Latest notice
9 homes
Planning references supplied
DZ22A/0729
Public location
Cherrywood, Dublin 18, Dublin

Public source geography

Site location

Public site / locality
Cherrywood, Dublin 18, Dublin
County
Dublin

Public site labels seen across the notices

  • Dublin, Dublin
  • Loughlinstown, Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning referenceDZ22A/0729

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0119940DR BCMS owner-supplied export

Cherrywood T3 (CN5), Cherrywood Village, Cherrywood, Dublin 18 comprising the construction of 9 No. 2-storey terraced houses including associated site development works.

9 homes · 760 m² · stated on this notice

Planning reference DZ22A/0729 Builder stated: Quintain Construction Company Ltd
CN0119939DR BCMS owner-supplied export

Cherrywood T3 (CN3), Cherrywood Village, Cherrywood, Dublin 18 comprising the construction of 12 No. 2-storey terraced houses, including associated site development works.

12 homes · 1,426 m² · stated on this notice

Planning reference DZ22A/0729 Builder stated: Quintain Construction Company Ltd
SN0011090DR BCMS open-data feed

Cherrywood T3 (CN2), Cherrywood Village, Cherrywood, Dublin 18 comprising the construction of a 3-storey Duplex Block consisting of 12 No. Duplex Units, including associated site development works.

12 units · 1,375 m² · stated on this notice

Planning reference DZ22A/0729
SN0011089DR BCMS open-data feed

Cherrywood T3 (CN1), Cherrywood Village, Cherrywood, Dublin 18 comprising the construction of a 3-storey Duplex Block consisting of 8 No. Duplex Units, including associated site development works.

8 units · 1,009 m² · stated on this notice

Planning reference DZ22A/0729
SN0011088DR BCMS open-data feed

Cherrywood T3 (CN6), Cherrywood Village, Cherrywood, Dublin 18 comprising the construction of a 3-storey Duplex Block consisting of 6 No. Duplex Units, including associated site development works.

6 units · 754 m² · stated on this notice

Planning reference DZ22A/0729
SN0011083DR BCMS open-data feed

Cherrywood T3 (CN4), Cherrywood Village, Cherrywood, Dublin 18 comprising the construction of a 3-storey Duplex Block consisting of 8 No. Duplex Units, including associated site development works.

8 units · 840 m² · stated on this notice

Planning reference DZ22A/0729

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.