Site start
Housing site start — Rathmines
Rathmines, Dublin
2 commencement notices · latest start date 23 May 2016 · planning reference given
Planning 4055/15
- Commencement notices
- 2
- Latest start date
- 23 May 2016
- Latest notice
- 1 unit
- Planning reference
- 4055/15
- Location
- Rathmines, Dublin
Location
Where the site is
- Area
- Rathmines, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Modifications to existing 4 storey house to include a change of use from office to residential on the upper 3 no floor levels,the provision of 2 no bathrooms,a new kitchen,a gas fired central heating system,new railings and gate along parker hill and repair of the existing paving slabs, and all associated site works and ancilliary works. No 166 is a registered protected structure.
PROTECTED STRUCTURE: Planning permission for development at 166 Lower Rathmines Road (a protected structure), Rathmines, Dublin 6 at the corner of Parker Hill. The development will consist of the following modifications to the existing 4 storey end of terrace building; Change of use from commercial offices to residential use of upper ground first and second floors. The installation of 2 no. bathrooms and a kitchen and associated services. The installation of a gas fired heating system. The installation of new railings and gate along Parker Hill. The repair of existing paving slabs to front garden. All of the above will include associated and ancillary works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.