Site start
Commercial site start — Dublin
Dublin 2, Dublin
1 commencement notice · start date 12 Sep 2016 · planning reference given
Planning 2931/16
- Commencement notices
- 1
- Latest start date
- 12 Sep 2016
- Latest notice
- Scale not stated
- Planning reference
- 2931/16
- Location
- 81A Sir John Rogerson's Quay, Dublin 2
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
Addresses on the notices
- 81A Sir John Rogerson's Quay, Dublin 2
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Conservation refurbishment, redevelopment and reuse of the existing marine based industrial/warehouse building including provision of a public boardwalk over the existing quay wall (which is a Protected Structure RPS No. 7542) and the River Liffey. The balustrade to the boardwalk will also act as a river flood defence barrier. The development also includes provision of apex rooflights; a new enlarged door opening in the East and West gables; reinstatement of external sliding doors to the existing openings along the North and South facades; installation of a mezzanine level; feature clerestory glazing below the eaves level on the south and north elevations; aluminium framed circular window to the east and west elevations; additional 4no. high level steel framed windows on northern elevation; provision of level access, with cobble stone finish, to both of these entrances; provision of internal staircases, services; toilets; signage; lighting; and all other ancillary works including SUDS drainage.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.