Commencement notice group
Building extension commencement notices — Leopardstown
Leopardstown, Dublin
1 separate notice · latest notified commencement 28 May 2026 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 28 May 2026
- Latest notice
- 1 unit
- Planning references supplied
- D26B/0053/WEB
- Public location
- Leopardstown, Dublin
Public source geography
Site location
- Public site / locality
- Leopardstown, Dublin
- County
- Dublin
Public site labels seen across the notices
- roof level, changing the main roof from a hip to a gable type roof and new side gable wall
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Building up of the side gable wall at roof level, changing the main roof from a hip to a gable type roof and new side gable wall. Fitting a new window in this newly constructed gable wall. Conversion of the existing roof void to a non-habitable attic space with roof windows to the rear of the main roof and associated internal works.
1 unit · 20 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.