Site start
Housing site start — Dun Laoghaire
Dun Laoghaire, Dublin
1 commencement notice · start date 28 Jun 2022 · planning reference given
Planning D21B/0423 · Planning application
- Commencement notices
- 1
- Latest start date
- 28 Jun 2022
- Latest notice
- 1 house
- Planning reference
- D21B/0423
- Location
- Dun Laoghaire, Dublin
Location
Where the site is
- Area
- Dun Laoghaire, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1) demolition of exterior and interior walls and exterior windows at first and second floor level along with the removal of the existing roof canopy at ground floor level and the pitched roof at first floor level. Internal garden walls will also be demolished. 2) Provision of a single storey porch to the front of the house and a single storey extension to the rear. 3) Provision of a three storey extension to the north side of the dwelling (the ground floor element will extend to the northern boundary of the site, the second and third floor level will accommodate a staircase) 4) Provision of an additional floor over the dwelling (resulting in a three storey dwelling). 5) Changes to the elevations that remain including the front elevation. 6) Internal reconfiguration of the existing floor area. 7) Provision of a new elevated terrace to the rear. 8). Landscaping works including new stopes on all four sides if the dwelling. 9) All associated site works including levelling of front driveway.
Floor area stated for this source: 305 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.