Commencement notice group

Commercial commencement notices — Annesbrook

Annesbrook, Meath

5 separate notices · latest notified commencement 10 Jun 2026 · planning reference supplied

Source notices
5
Latest notified commencement
10 Jun 2026
Latest notice
616 m²
Planning references supplied
21/2347
Public location
Annesbrook, Meath

Public source geography

Site location

Public site / locality
Annesbrook, Meath
County
Meath

Public site labels seen across the notices

  • Annesbrook, Duleek, Meath
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Meath County Council · reference 21/2347 Official council planning portal Verified official link Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference21/2347

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0014309MH BCMS open-data feed

Construction of an industrial building as part of an anaerobic digestion facility. This phase of the development will comprise the construction of the reinforced concrete slab and reinforced concrete/block walls of the building only. The steel frame superstructure and roof are excluded from this phase and will form part of a separate future phase of development.

616 m² · stated on this notice

Planning reference 21/2347
SN0014078MH BCMS open-data feed

Construction of a pump rooom as part of the construction of an anaerobic digestion facility

56 m² · stated on this notice

Planning reference 21/2347
SN0013936MH BCMS open-data feed

Construction of a pump room as part of the construction of an anaerobic digestion facility

100 m² · stated on this notice

Planning reference 21/2347
SN0013933MH BCMS open-data feed

Construction of an office building as part of the construction of an anaerobic digestion facility

324 m² · stated on this notice

Planning reference 21/2347

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.