Site start

Part 1 to part 4 storey mixed use building, above lower ground floor level

Dublin

1 commencement notice · start date 18 Nov 2026 · no planning reference given

Commencement notices
1
Latest start date
18 Nov 2026
Latest notice
16 units
Planning references
None given
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin

Addresses on the notices

  • the upper ground floor level and a plant area is proposed at roof level
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Seven-day notice

Part 1 to part 4 storey mixed use building, above lower ground floor level (5 storeys total). Development consists of 16 residential apartments with roof terrace above a commercial/community space on the lower ground and first floor. A double ESB substation and switchrooms are located at the upper ground floor level and a plant area is proposed at roof level.

Work stated for this notice 16 units Explicit phase quantity stated by the source.

Floor area stated for this source: 2,246 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.