Commencement notice group

Housing commencement notices — Bray

Bray, Wicklow

1 unique commencement event · latest notified commencement 21 Mar 2023 · planning basis not stated

View full project timeline

Unique commencement events
1
Latest notified commencement
21 Mar 2023
Latest notice
1 house
Planning references supplied
None stated
Public location
Bray, Wicklow

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Bray, Wicklow
County
Wicklow

Notice location variants

  • ground floor and 98m2 at first floor including the following
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Wicklow County Council planning record Application details, status and decision record for 2167. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

136m2 ground and first floor extension to existing 115m2 house made up of 38m2 at ground floor and 98m2 at first floor including the following; raising ridge height by 400mm, alterations to current fenestration, extending ground floor to provide additional accommodation and additional accommodation at first floor to provide 3 bedrooms, replace existing septic tank with new effluent disposal system to EPA guidelines 2009 and associated site works

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 220 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.