Site start
Building extension site start — Emyvale
Emyvale, Monaghan
1 commencement notice · start date 13 Aug 2024 · no planning reference given
Planning 22225 (Monaghan County Council)
- Commencement notices
- 1
- Latest start date
- 13 Aug 2024
- Latest notice
- 362 m²
- Planning references
- None given
- Location
- Emyvale, Monaghan
Location
Where the site is
- Area
- Emyvale, Monaghan
- County
- Monaghan
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
(1) Material alterations to existing church building comprising a replacement roof (with retention of existing timber trusses), a replacement ceiling, erection of a replacement entrance lobby, reorganised sanctuary layout, upgrading of insulation to floor, walls and roof, and new lighting and rewiring throughout (Area M2 249). (2) Erection of new single storey masonry sacristy/meeting room extension (Area M2 113)
Floor area stated for this source: 362 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.