Site start
The proposed development will consist of the construction of a first-floor extension above
Dublin 9, Dublin
1 commencement notice · start date 12 Oct 2026 · no planning reference given
Planning Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 12 Oct 2026
- Latest notice
- 14 m²
- Planning references
- None given
- Location
- Dublin 9, Dublin
Location
Where the site is
- Area
- Dublin 9, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The proposed development will consist of the construction of a first-floor extension above the existing single-storey side structure (formerly a garage) to provide additional accommodation in the form of a bedroom. The development will include external finishes to match the existing dwelling, including render and brickwork, together with 100mm external insulation to the gable wall of the proposed extension. The existing roof will be extended to cover the entire new building footprint, maintaining the existing ridge height, existing eaves height, hipped roof profile and roof finishes, together with all associated site works, drainage works, and ancillary works necessary to facilitate the development.
Floor area stated for this source: 14 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.