Site start

Site start — Finglas

Finglas, Dublin

1 commencement notice · start date 23 Jun 2026 · planning reference given

Planning ABP-314894-22

Commencement notices
1
Latest start date
23 Jun 2026
Latest notice
467 m²
Planning reference
ABP-314894-22
Location
Finglas, Dublin

Location

Where the site is

Area
Finglas, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-314894-22. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

220kV GIS Eirgrid substation comprising a single-storey building

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 467 m².

Appeal reference ABP-314894-22 Developer stated: Kilshane Energy Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.