Commencement notice group
Housing commencement notices — Bray
Bray, Dublin
5 unique commencement events · latest notified commencement 21 Sep 2026 · planning reference supplied
- Unique commencement events
- 5
- Latest notified commencement
- 21 Sep 2026
- Latest notice
- 8 units
- Planning references supplied
- D25A/0673/WEB
- Public location
- Bray, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Bray, Dublin
- County
- Dublin
Notice location variants
- first floor, all associated parking, landscaped areas and ancillary site development works CN0147577DR
- first and second floor, all associated parking, landscaped areas and ancillary site development works CN0147535DR, CN0147534DR, CN0147533DR
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of Duplex Block D, consisting of 8no. residential units in a 2-storey duplex block, 4no. ground floor apartments and 4no. apartments at first floor, all associated parking, landscaped areas and ancillary site development works.
Floor area stated for this source: 503 m².
Construction of Duplex Block A, consisting of 2no. residential units in a 3-storey duplex block, 1no. ground floor apartment and 1no. duplex at first and second floor, all associated parking, landscaped areas and ancillary site development works.
Floor area stated for this source: 183 m².
Construction of Duplex Block B, consisting of 4no. residential units in a 3-storey duplex block, 2no. ground floor apartments and 2no. duplexes at first and second floor, all associated parking, landscaped areas and ancillary site development works.
Floor area stated for this source: 332 m².
Construction of Duplex Block C, consisting of 4no. residential units in a 3-storey duplex block, 2no. ground floor apartments and 2no. duplexes at first and second floor, all associated parking, landscaped areas and ancillary site development works.
Floor area stated for this source: 332 m².
Development consisting of the construction of 11no. 3 storey dwellings, 15no. 2 storey dwellings, all associated parking, landscaped open spaces and ancillary site development works.
Floor area stated for this source: 2,902 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.