Site start

Site start — Dublin

Dublin 8, Dublin

1 commencement notice · start date 21 Jul 2025 · planning reference given

Planning 4115/24 · Planning application

View full project timeline

Planning story

Dublin 8, Dublin — 4115/24

Exact official references
4115/24
Final official decision
GRANT PERMISSION
Commencement notices
1
Latest start date
21 Jul 2025

No overall constructed, completed-unit or percentage-progress figure is inferred from these notices.

Commencement notices
1
Latest start date
21 Jul 2025
Latest notice
1,095 m²
Planning reference
4115/24
Location
Dublin 8, Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1

Planning 4115/24 — GRANT PERMISSION · Decision 2024-09-25 · Final grant 2024-11-14

  1. Completion certificate validated Dublin City Council · commencement notice Completion certificate · Certificate validation date 2026-08-28 See official certificate for completed works · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Dublin 8, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of a Specialist Railway Simulator Training Building to support Driver training for the planned DART expansion Project (DEP). This will be in the form of a Modular Construction 2 storey building within the existing Inchicore Railway Works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,095 m².

Planning reference 4115/24

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.