Commencement notice group

Building extension commencement notices — Carraroe

Carraroe, Galway

1 separate notice · latest notified commencement 01 Aug 2025 · planning basis not stated

Source notices
1
Latest notified commencement
01 Aug 2025
Latest notice
239 m²
Planning references supplied
None stated
Public location
Carraroe, Galway

Public source geography

Site location

Public site / locality
Carraroe, Galway
County
Galway
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

SN0012870GC BCMS open-data feed

Construction of extension existing school, material alterations and associated site works. New building extension is single-storey and will consist of two Special Education Needs (SEN) Classrooms and accompanying sanitary facilities.

239 m² · stated on this notice

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.